VinBera2 Logo

BMW M4 COMPETI 2024

WBS43AZ03RCN76347

WBS43AZ03RCN76347_1 WBS43AZ03RCN76347_2 WBS43AZ03RCN76347_3 WBS43AZ03RCN76347_4 WBS43AZ03RCN76347_5 WBS43AZ03RCN76347_6 WBS43AZ03RCN76347_7 WBS43AZ03RCN76347_8 WBS43AZ03RCN76347_9 WBS43AZ03RCN76347_10 WBS43AZ03RCN76347_11 WBS43AZ03RCN76347_12
Details
Final Bid: 17100
VIN WBS43AZ03RCN76347
Year 2024
Odometer 722 mi
Engine 3.0L 6
Gearbox AUTOMATIC
Drive train All wheel drive
Color GRAY
Fuel GAS
Keys No
Information
Auction date 22-08-2023
Sale type Auction
Status Sold
Seller
Location NY - NEWBURGH
Damage Stripped,

BMW M4 COMPETI 2024

WBS43AZ03RCN76347

Discover the auction opportunity for the BMW M4 COMPETI 2024 with VIN: WBS43AZ03RCN76347. This vehicle is located in NY - NEWBURGH and is offered by n/a.

Our detailed vehicle report indicates that this GRAY BMW M4 COMPETI 2024 has sustained damage to the Stripped, .

With a mileage of 722 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.

Don't miss your chance to bid on this BMW M4 COMPETI 2024 WBS43AZ03RCN76347. Best of luck with your auction!

YOU MAY ALSO LIKE

5UXCR6C56KLL01921
VIN: 5UXCR6C56KLL01921
Final Bid: 34000

BMW X5 XDRIVE4 2019

5UXTY5C0XM9G38483
VIN: 5UXTY5C0XM9G38483
Final Bid: 11300

BMW X3 XDRIVE3 2021

WBS83CH03MCF39647
VIN: WBS83CH03MCF39647
Final Bid: 39250

BMW M5 2021

WBS3C9C51FP805143
VIN: WBS3C9C51FP805143
Final Bid: 15600

BMW M3 2015