| Details
Final Bid: 54500
|
|
|---|---|
| VIN | WBS33BA01RCP01715 |
| Year | 2024 |
| Odometer | 1569 mi |
| Engine | 3.0L 6 |
| Gearbox | AUTOMATIC |
| Drive train | All wheel drive |
| Color | WHITE |
| Fuel | GAS |
| Keys | Yes |
| Information | |
|---|---|
| Auction date | 02-04-2024 |
| Sale type | Auction |
| Status | Sold |
| Seller | |
| Location | NH - CANDIA |
| Damage | All Over, |
Discover the auction opportunity for the BMW M4 COMPETI 2024 with VIN: WBS33BA01RCP01715. This vehicle is located in NH - CANDIA and is offered by n/a.
Our detailed vehicle report indicates that this WHITE BMW M4 COMPETI 2024 has sustained damage to the All Over, .
With a mileage of 1569 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.
Don't miss your chance to bid on this BMW M4 COMPETI 2024 WBS33BA01RCP01715. Best of luck with your auction!