| Details
Final Bid: 22700
|
|
|---|---|
| VIN | WBS8M9C54J5K98990 |
| Year | 2018 |
| Odometer | 49260 mi |
| Engine | 3.0L 6 |
| Gearbox | AUTOMATIC |
| Drive train | Rear-wheel drive |
| Color | BURGUNDY |
| Fuel | GAS |
| Keys | Yes |
| Information | |
|---|---|
| Auction date | 19-10-2023 |
| Sale type | Auction |
| Status | Sold |
| Seller | |
| Location | TX - HOUSTON EAST |
| Damage | Front End, Minor Dent/scratches |
Discover the auction opportunity for the BMW M3 2018 with VIN: WBS8M9C54J5K98990. This vehicle is located in TX - HOUSTON EAST and is offered by n/a.
Our detailed vehicle report indicates that this BURGUNDY BMW M3 2018 has sustained damage to the Front End, Minor Dent/scratches.
With a mileage of 49260 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.
Don't miss your chance to bid on this BMW M3 2018 WBS8M9C54J5K98990. Best of luck with your auction!