| Details
Final Bid: 42325
|
|
|---|---|
| VIN | WBS33AY06NFM23886 |
| Year | 2022 |
| Odometer | |
| Engine | 3.0L 6-CYLINDER TWINPOWER |
| Gearbox | Automatic Transmission |
| Drive train | Rear Wheel Drive |
| Color | Unknown |
| Fuel | Gasoline |
| Keys | Yes |
| Information | |
|---|---|
| Auction date | 26-04-2023 |
| Sale type | Auction |
| Status | Sold |
| Seller | State Farm Group Insurance |
| Location | North Hollywood (CA) |
| Damage | Unknown, |
Discover the auction opportunity for the BMW M3 COMPETITION 2022 with VIN: WBS33AY06NFM23886. This vehicle is located in North Hollywood (CA) and is offered by State Farm Group Insurance.
Our detailed vehicle report indicates that this Unknown BMW M3 COMPETITION 2022 has sustained damage to the Unknown, .
With a mileage of , it features a 3.0L 6-CYLINDER TWINPOWER engine, an Automatic Transmission gearbox, and runs on Gasoline.
Don't miss your chance to bid on this BMW M3 COMPETITION 2022 WBS33AY06NFM23886. Best of luck with your auction!