| Details
Final Bid: 45475
|
|
|---|---|
| VIN | WBS33BA0XNCJ93996 |
| Year | 2022 |
| Odometer | 10345 mi |
| Engine | 3.0L 6-CYLINDER TWINPOWER |
| Gearbox | Automatic Transmission |
| Drive train | All Wheel Drive |
| Color | Gray |
| Fuel | Gasoline |
| Keys | Yes |
| Information | |
|---|---|
| Auction date | 08-05-2023 |
| Sale type | Auction |
| Status | Sold |
| Seller | Geico Insurance |
| Location | Honolulu (HI) |
| Damage | Mechanical, |
Discover the auction opportunity for the BMW M4 COMPETITION XDRIVE 2022 with VIN: WBS33BA0XNCJ93996. This vehicle is located in Honolulu (HI) and is offered by Geico Insurance.
Our detailed vehicle report indicates that this Gray BMW M4 COMPETITION XDRIVE 2022 has sustained damage to the Mechanical, .
With a mileage of 10345 mi, it features a 3.0L 6-CYLINDER TWINPOWER engine, an Automatic Transmission gearbox, and runs on Gasoline.
Don't miss your chance to bid on this BMW M4 COMPETITION XDRIVE 2022 WBS33BA0XNCJ93996. Best of luck with your auction!