VinBera2 Logo

BMW M4 COMPETITION 2023

WBS33AZ02PCN00403

WBS33AZ02PCN00403_1 WBS33AZ02PCN00403_2 WBS33AZ02PCN00403_3 WBS33AZ02PCN00403_4 WBS33AZ02PCN00403_5 WBS33AZ02PCN00403_6 WBS33AZ02PCN00403_7 WBS33AZ02PCN00403_8 WBS33AZ02PCN00403_9 WBS33AZ02PCN00403_10 WBS33AZ02PCN00403_11 WBS33AZ02PCN00403_12 WBS33AZ02PCN00403_13 WBS33AZ02PCN00403_14 WBS33AZ02PCN00403_15 WBS33AZ02PCN00403_16
Details
Final Bid: 37375
VIN WBS33AZ02PCN00403
Year 2023
Odometer 3844 mi
Engine 3.0L I-6 DI, DOHC, VVT, turbo, 503HP
Gearbox Automatic
Drive train Rear Wheel Drive
Color Burgundy
Fuel Gasoline
Keys Yes
Information
Auction date 13-03-2024
Sale type Auction
Status Sold
Seller State Farm Group Insurance
Location North Hollywood (CA)
Damage Left & Right Side, Front & Rear

BMW M4 COMPETITION 2023

WBS33AZ02PCN00403

Discover the auction opportunity for the BMW M4 COMPETITION 2023 with VIN: WBS33AZ02PCN00403. This vehicle is located in North Hollywood (CA) and is offered by State Farm Group Insurance.

Our detailed vehicle report indicates that this Burgundy BMW M4 COMPETITION 2023 has sustained damage to the Left & Right Side, Front & Rear.

With a mileage of 3844 mi, it features a 3.0L I-6 DI, DOHC, VVT, turbo, 503HP engine, an Automatic gearbox, and runs on Gasoline.

Don't miss your chance to bid on this BMW M4 COMPETITION 2023 WBS33AZ02PCN00403. Best of luck with your auction!

YOU MAY ALSO LIKE

WBS3R9C33HA014308
VIN: WBS3R9C33HA014308
Final Bid: 17200

BMW M4 2017

WBA5U9C01LFH24422
VIN: WBA5U9C01LFH24422
Final Bid: 31250

BMW M3 40XI 2020

WBA5B1C53GG129653
VIN: WBA5B1C53GG129653
Final Bid: 4000

BMW 5 SERIES 535 I 2016

5UXCR6C53KLL62434
VIN: 5UXCR6C53KLL62434
Final Bid: 16300

BMW X5 XDRIVE4 2019