| Details
Final Bid: 31325
|
|
|---|---|
| VIN | WBS3S7C01LAH85165 |
| Year | 2020 |
| Odometer | 2558 mi |
| Engine | 3.0L 6-Cylinder TwinPower |
| Gearbox | Automatic |
| Drive train | Rear Wheel Drive |
| Color | |
| Fuel | Gasoline |
| Keys | No |
| Information | |
|---|---|
| Auction date | 01-02-2021 |
| Sale type | Auction |
| Status | Sold |
| Seller | Progressive Casualty Insurance |
| Location | |
| Damage | Left Front, Unknown |
Discover the auction opportunity for the BMW M4 2020 with VIN: WBS3S7C01LAH85165. offered by Progressive Casualty Insurance.
Our detailed vehicle report indicates that this BMW M4 2020 has sustained damage to the Left Front, Unknown.
With a mileage of 2558 mi, it features a 3.0L 6-Cylinder TwinPower engine, an Automatic gearbox, and runs on Gasoline.
Don't miss your chance to bid on this BMW M4 2020 WBS3S7C01LAH85165. Best of luck with your auction!