VinBera2 Logo

BMW M2 COMPETI 2020

WBS2U7C04L7E69732

WBS2U7C04L7E69732_1 WBS2U7C04L7E69732_2 WBS2U7C04L7E69732_3 WBS2U7C04L7E69732_4 WBS2U7C04L7E69732_5 WBS2U7C04L7E69732_6 WBS2U7C04L7E69732_7 WBS2U7C04L7E69732_8 WBS2U7C04L7E69732_9 WBS2U7C04L7E69732_10
Details
Final Bid: 20900
VIN WBS2U7C04L7E69732
Year 2020
Odometer 26854 mi
Engine 3.0L 6
Gearbox AUTOMATIC
Drive train Rear-wheel drive
Color ORANGE
Fuel GAS
Keys Yes
Information
Auction date 25-01-2023
Sale type Auction
Status Sold
Seller
Location CO - COLORADO SPRINGS
Damage Front End, Rear End

BMW M2 COMPETI 2020

WBS2U7C04L7E69732

Discover the auction opportunity for the BMW M2 COMPETI 2020 with VIN: WBS2U7C04L7E69732. This vehicle is located in CO - COLORADO SPRINGS and is offered by n/a.

Our detailed vehicle report indicates that this ORANGE BMW M2 COMPETI 2020 has sustained damage to the Front End, Rear End.

With a mileage of 26854 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.

Don't miss your chance to bid on this BMW M2 COMPETI 2020 WBS2U7C04L7E69732. Best of luck with your auction!

YOU MAY ALSO LIKE

WBAJE7C33HWA03309
VIN: WBAJE7C33HWA03309
Final Bid: 17300

BMW 5 SERIES 540 XI 2017

WBAVM5C50EVV93297
VIN: WBAVM5C50EVV93297
Final Bid: 4525

BMW X1 XDRIVE35I 2014

WBAJE5C59KWW28906
VIN: WBAJE5C59KWW28906
Final Bid: 12600

BMW 5 SERIES 540 I 2019

WBXJG7C04N5U91173
VIN: WBXJG7C04N5U91173
Final Bid: 15300

BMW X1 SDRIVE2 2022