| Details
Final Bid: 40750
|
|
|---|---|
| VIN | WBS33AZ09MCG42200 |
| Year | 2021 |
| Odometer | 2209 mi |
| Engine | 3.0L 6 |
| Gearbox | AUTOMATIC |
| Drive train | Rear-wheel drive |
| Color | GREEN |
| Fuel | GAS |
| Keys | No |
| Information | |
|---|---|
| Auction date | 31-01-2022 |
| Sale type | Auction |
| Status | Sold |
| Seller | |
| Location | PA - YORK HAVEN |
| Damage | Water/flood, |
Discover the auction opportunity for the BMW M4 COMPETI 2021 with VIN: WBS33AZ09MCG42200. This vehicle is located in PA - YORK HAVEN and is offered by n/a.
Our detailed vehicle report indicates that this GREEN BMW M4 COMPETI 2021 has sustained damage to the Water/flood, .
With a mileage of 2209 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.
Don't miss your chance to bid on this BMW M4 COMPETI 2021 WBS33AZ09MCG42200. Best of luck with your auction!