VinBera2 Logo

BMW M5 2022

WBS83CH06NCJ07794

WBS83CH06NCJ07794_1 WBS83CH06NCJ07794_2 WBS83CH06NCJ07794_3 WBS83CH06NCJ07794_4 WBS83CH06NCJ07794_5 WBS83CH06NCJ07794_6 WBS83CH06NCJ07794_7 WBS83CH06NCJ07794_8 WBS83CH06NCJ07794_9 WBS83CH06NCJ07794_10 WBS83CH06NCJ07794_11
Details
Final Bid: 55275
VIN WBS83CH06NCJ07794
Year 2022
Odometer 18145 mi
Engine 4.4L TWINPOWER TURBO V8
Gearbox Automatic Transmission
Drive train All Wheel Drive
Color Gray
Fuel Gasoline
Keys Yes
Information
Auction date 03-04-2023
Sale type Auction
Status Not sold
Seller New Jersey Manufacturing Group
Location Sayreville (NJ)
Damage Front End, Right Side

BMW M5 2022

WBS83CH06NCJ07794

Discover the auction opportunity for the BMW M5 2022 with VIN: WBS83CH06NCJ07794. This vehicle is located in Sayreville (NJ) and is offered by New Jersey Manufacturing Group.

Our detailed vehicle report indicates that this Gray BMW M5 2022 has sustained damage to the Front End, Right Side.

With a mileage of 18145 mi, it features a 4.4L TWINPOWER TURBO V8 engine, an Automatic Transmission gearbox, and runs on Gasoline.

Don't miss your chance to bid on this BMW M5 2022 WBS83CH06NCJ07794. Best of luck with your auction!

YOU MAY ALSO LIKE

WBA5U9C09LFJ98053
VIN: WBA5U9C09LFJ98053
Final Bid: 725

BMW M3 40XI 2020

WBA2J7C59KVD61030
VIN: WBA2J7C59KVD61030
Final Bid: 11225

BMW 2 SERIES M240I XDRIVE 2019

WBA5B3C54GG257329
VIN: WBA5B3C54GG257329
Final Bid: 5900

BMW 5 SERIES 535 XI 2016

3MW5R1J02M8B93907
VIN: 3MW5R1J02M8B93907
Final Bid: 11400

BMW 3 SERIES 330I 2021