| Details
Final Bid: 19000
|
|
|---|---|
| VIN | WBS1J5C57JVD36797 |
| Year | 2018 |
| Odometer | 11296 mi |
| Engine | 3.0L 6 |
| Gearbox | AUTOMATIC |
| Drive train | Rear-wheel drive |
| Color | WHITE |
| Fuel | GAS |
| Keys | Yes |
| Information | |
|---|---|
| Auction date | 20-04-2021 |
| Sale type | Auction |
| Status | Sold |
| Seller | |
| Location | IL - CHICAGO NORTH |
| Damage | Front End, |
Discover the auction opportunity for the BMW M2 2018 with VIN: WBS1J5C57JVD36797. This vehicle is located in IL - CHICAGO NORTH and is offered by n/a.
Our detailed vehicle report indicates that this WHITE BMW M2 2018 has sustained damage to the Front End, .
With a mileage of 11296 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.
Don't miss your chance to bid on this BMW M2 2018 WBS1J5C57JVD36797. Best of luck with your auction!