VinBera2 Logo

BMW M4 2020

WBS3S7C01LFH14728

WBS3S7C01LFH14728_1 WBS3S7C01LFH14728_2 WBS3S7C01LFH14728_3 WBS3S7C01LFH14728_4 WBS3S7C01LFH14728_5 WBS3S7C01LFH14728_6 WBS3S7C01LFH14728_7 WBS3S7C01LFH14728_8 WBS3S7C01LFH14728_9 WBS3S7C01LFH14728_10 WBS3S7C01LFH14728_11
Details
Final Bid: 35825
VIN WBS3S7C01LFH14728
Year 2020
Odometer 3873 mi
Engine 3.0L 6-Cylinder TwinPower
Gearbox Automatic
Drive train Rear Wheel Drive
Color
Fuel Gasoline
Keys Yes
Information
Auction date 18-01-2021
Sale type Auction
Status Sold
Seller Geico Insurance
Location
Damage Front & Rear, Mechanical

BMW M4 2020

WBS3S7C01LFH14728

Discover the auction opportunity for the BMW M4 2020 with VIN: WBS3S7C01LFH14728. offered by Geico Insurance.

Our detailed vehicle report indicates that this BMW M4 2020 has sustained damage to the Front & Rear, Mechanical.

With a mileage of 3873 mi, it features a 3.0L 6-Cylinder TwinPower engine, an Automatic gearbox, and runs on Gasoline.

Don't miss your chance to bid on this BMW M4 2020 WBS3S7C01LFH14728. Best of luck with your auction!

YOU MAY ALSO LIKE

3MW5U9J0XM8B54964
VIN: 3MW5U9J0XM8B54964

BMW M340XI 2021

WBAJA9C58KB389732
VIN: WBAJA9C58KB389732
Final Bid: 9100

BMW 5 SERIES 530E 2019

5UXTS3C5XJ0Y96095
VIN: 5UXTS3C5XJ0Y96095
Final Bid: 21600

BMW X3 XDRIVEM 2018

WBA5A5C55GG354599
VIN: WBA5A5C55GG354599
Final Bid: 2375

BMW 5 SERIES 528I 2016