| Details
Final Bid: 15600
|
|
|---|---|
| VIN | WBS3C9C51FP805143 |
| Year | 2015 |
| Odometer | 60587 mi |
| Engine | 3.0L 6 |
| Gearbox | AUTOMATIC |
| Drive train | Rear-wheel drive |
| Color | SILVER |
| Fuel | GAS |
| Keys | No |
| Information | |
|---|---|
| Auction date | 23-12-2022 |
| Sale type | Auction |
| Status | Sold |
| Seller | |
| Location | CT - HARTFORD |
| Damage | Front End, |
Discover the auction opportunity for the BMW M3 2015 with VIN: WBS3C9C51FP805143. This vehicle is located in CT - HARTFORD and is offered by n/a.
Our detailed vehicle report indicates that this SILVER BMW M3 2015 has sustained damage to the Front End, .
With a mileage of 60587 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.
Don't miss your chance to bid on this BMW M3 2015 WBS3C9C51FP805143. Best of luck with your auction!