VinBera2 Logo

BMW M4 COMPETITION XDRIVE 2023

WBS43AZ09PCM40687

WBS43AZ09PCM40687_1 WBS43AZ09PCM40687_2 WBS43AZ09PCM40687_3 WBS43AZ09PCM40687_4 WBS43AZ09PCM40687_5 WBS43AZ09PCM40687_6 WBS43AZ09PCM40687_7 WBS43AZ09PCM40687_8 WBS43AZ09PCM40687_9 WBS43AZ09PCM40687_10 WBS43AZ09PCM40687_11 WBS43AZ09PCM40687_12 WBS43AZ09PCM40687_13 WBS43AZ09PCM40687_14 WBS43AZ09PCM40687_15 WBS43AZ09PCM40687_16
Details
Final Bid: 39475
VIN WBS43AZ09PCM40687
Year 2023
Odometer 0 mi
Engine 3.0L 6-Cylinder TwinPower
Gearbox Automatic
Drive train All-Wheel Drive
Color
Fuel Gasoline
Keys Yes
Information
Auction date 01-11-2023
Sale type Auction
Status Sold
Seller Auto Club of Southern CA (ACSC)
Location
Damage Unknown,

BMW M4 COMPETITION XDRIVE 2023

WBS43AZ09PCM40687

Discover the auction opportunity for the BMW M4 COMPETITION XDRIVE 2023 with VIN: WBS43AZ09PCM40687. offered by Auto Club of Southern CA (ACSC).

Our detailed vehicle report indicates that this BMW M4 COMPETITION XDRIVE 2023 has sustained damage to the Unknown, .

With a mileage of 0 mi, it features a 3.0L 6-Cylinder TwinPower engine, an Automatic gearbox, and runs on Gasoline.

Don't miss your chance to bid on this BMW M4 COMPETITION XDRIVE 2023 WBS43AZ09PCM40687. Best of luck with your auction!

YOU MAY ALSO LIKE

WBS3R9C57FK334241
VIN: WBS3R9C57FK334241
Final Bid: 12525

BMW M4 2015

WBXHT3C34G5E55244
VIN: WBXHT3C34G5E55244
Final Bid: 9800

BMW X1 XDRIVE2 2016

5UX43DP05P9T06041
VIN: 5UX43DP05P9T06041
Final Bid: 18300

BMW X3 SDRIVE3 2023

3MW5R1J01L8B04018
VIN: 3MW5R1J01L8B04018
Final Bid: 10000

BMW 3 SERIES 330I 2020