| Details
Final Bid: 24200
|
|
|---|---|
| VIN | WBS33BA00NCK89507 |
| Year | 2022 |
| Odometer | 4459 mi |
| Engine | 3.0L 6 |
| Gearbox | AUTOMATIC |
| Drive train | All wheel drive |
| Color | SILVER |
| Fuel | GAS |
| Keys | Yes |
| Information | |
|---|---|
| Auction date | 07-03-2023 |
| Sale type | Auction |
| Status | Sold |
| Seller | |
| Location | FL - MIAMI NORTH |
| Damage | All Over, |
Discover the auction opportunity for the BMW M4 COMPETI 2022 with VIN: WBS33BA00NCK89507. This vehicle is located in FL - MIAMI NORTH and is offered by n/a.
Our detailed vehicle report indicates that this SILVER BMW M4 COMPETI 2022 has sustained damage to the All Over, .
With a mileage of 4459 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.
Don't miss your chance to bid on this BMW M4 COMPETI 2022 WBS33BA00NCK89507. Best of luck with your auction!