VinBera2 Logo

BMW 5 SERIES 540 XI 2018

WBAJE7C53JWD49562

WBAJE7C53JWD49562_1 WBAJE7C53JWD49562_2 WBAJE7C53JWD49562_3 WBAJE7C53JWD49562_4 WBAJE7C53JWD49562_5 WBAJE7C53JWD49562_6 WBAJE7C53JWD49562_7 WBAJE7C53JWD49562_8 WBAJE7C53JWD49562_9 WBAJE7C53JWD49562_10 WBAJE7C53JWD49562_11 WBAJE7C53JWD49562_12
Details
Final Bid: 16200
VIN WBAJE7C53JWD49562
Year 2018
Odometer 59608 mi
Engine 3.0L 6
Gearbox AUTOMATIC
Drive train All wheel drive
Color BLACK
Fuel GAS
Keys Yes
Information
Auction date 27-08-2024
Sale type Auction
Status Sold
Seller GEICO
Location MN - MINNEAPOLIS NORTH
Damage Undercarriage, Front End

BMW 5 SERIES 540 XI 2018

WBAJE7C53JWD49562

Discover the auction opportunity for the BMW 5 SERIES 540 XI 2018 with VIN: WBAJE7C53JWD49562. This vehicle is located in MN - MINNEAPOLIS NORTH and is offered by GEICO.

Our detailed vehicle report indicates that this BLACK BMW 5 SERIES 540 XI 2018 has sustained damage to the Undercarriage, Front End.

With a mileage of 59608 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.

Don't miss your chance to bid on this BMW 5 SERIES 540 XI 2018 WBAJE7C53JWD49562. Best of luck with your auction!

YOU MAY ALSO LIKE

WBA73AP01NCK48780
VIN: WBA73AP01NCK48780
Final Bid: 19400

BMW 4 SERIES 430XI 2022

WBSGV0C01PCM86766
VIN: WBSGV0C01PCM86766

BMW M8 COMPETITION 2023

5UXTR9C54KLD95284
VIN: 5UXTR9C54KLD95284

BMW X3 XDRIVE30I 2019

5YMCY0C08L9D64355
VIN: 5YMCY0C08L9D64355
Final Bid: 71625

BMW X6 M 2020