| Details
Final Bid: 48750
|
|
|---|---|
| VIN | WBS33AY08NFM53777 |
| Year | 2022 |
| Odometer | 8392 mi |
| Engine | 3.0L 6 |
| Gearbox | AUTOMATIC |
| Drive train | Rear-wheel drive |
| Color | BLUE |
| Fuel | GAS |
| Keys | Yes |
| Information | |
|---|---|
| Auction date | 19-12-2022 |
| Sale type | Auction |
| Status | Sold |
| Seller | |
| Location | FL - MIAMI CENTRAL |
| Damage | Front End, |
Discover the auction opportunity for the BMW M3 COMPETI 2022 with VIN: WBS33AY08NFM53777. This vehicle is located in FL - MIAMI CENTRAL and is offered by n/a.
Our detailed vehicle report indicates that this BLUE BMW M3 COMPETI 2022 has sustained damage to the Front End, .
With a mileage of 8392 mi, it features a 3.0L 6 engine, an AUTOMATIC gearbox, and runs on GAS.
Don't miss your chance to bid on this BMW M3 COMPETI 2022 WBS33AY08NFM53777. Best of luck with your auction!