VinBera2 Logo

BMW M4 COMPETITION XDRIVE 2022

WBS43AZ09NCK35934

WBS43AZ09NCK35934_1 WBS43AZ09NCK35934_2 WBS43AZ09NCK35934_3 WBS43AZ09NCK35934_4 WBS43AZ09NCK35934_5 WBS43AZ09NCK35934_6 WBS43AZ09NCK35934_7 WBS43AZ09NCK35934_8 WBS43AZ09NCK35934_9 WBS43AZ09NCK35934_10 WBS43AZ09NCK35934_11 WBS43AZ09NCK35934_12
Details
Final Bid: 30675
VIN WBS43AZ09NCK35934
Year 2022
Odometer
Engine 3.0L 6-CYLINDER TWINPOWER
Gearbox Automatic Transmission
Drive train All Wheel Drive
Color Unknown
Fuel Gasoline
Keys Yes
Information
Auction date 19-04-2023
Sale type Auction
Status ON APPROVAL
Seller State Farm Group Insurance
Location North Hollywood (CA)
Damage Unknown,

BMW M4 COMPETITION XDRIVE 2022

WBS43AZ09NCK35934

Discover the auction opportunity for the BMW M4 COMPETITION XDRIVE 2022 with VIN: WBS43AZ09NCK35934. This vehicle is located in North Hollywood (CA) and is offered by State Farm Group Insurance.

Our detailed vehicle report indicates that this Unknown BMW M4 COMPETITION XDRIVE 2022 has sustained damage to the Unknown, .

With a mileage of , it features a 3.0L 6-CYLINDER TWINPOWER engine, an Automatic Transmission gearbox, and runs on Gasoline.

Don't miss your chance to bid on this BMW M4 COMPETITION XDRIVE 2022 WBS43AZ09NCK35934. Best of luck with your auction!

YOU MAY ALSO LIKE

WBS2U7C0XL7G23361
VIN: WBS2U7C0XL7G23361

BMW M2 COMPETITION 2020

WBA1J7C58FV358716
VIN: WBA1J7C58FV358716
Final Bid: 8450

BMW M235 2015

WBS4Y9C5XKAG67494
VIN: WBS4Y9C5XKAG67494
Final Bid: 17900

BMW M4 2019

WBA4B3C58FD669992
VIN: WBA4B3C58FD669992
Final Bid: 4900

BMW 4 SERIES 435 XI GRA 2015