| Details
Final Bid: 45900
|
|
|---|---|
| VIN | WBS33AY05NFM43885 |
| Year | 2022 |
| Odometer | 9874 mi |
| Engine | 3.0L 6-CYLINDER TWINPOWER |
| Gearbox | Automatic Transmission |
| Drive train | Rear Wheel Drive |
| Color | Gray |
| Fuel | Gasoline |
| Keys | Yes |
| Information | |
|---|---|
| Auction date | 12-09-2022 |
| Sale type | Auction |
| Status | Sold |
| Seller | Progressive Casualty Insurance |
| Location | Tampa North (FL) |
| Damage | Front End, |
Discover the auction opportunity for the BMW M3 COMPETITION 2022 with VIN: WBS33AY05NFM43885. This vehicle is located in Tampa North (FL) and is offered by Progressive Casualty Insurance.
Our detailed vehicle report indicates that this Gray BMW M3 COMPETITION 2022 has sustained damage to the Front End, .
With a mileage of 9874 mi, it features a 3.0L 6-CYLINDER TWINPOWER engine, an Automatic Transmission gearbox, and runs on Gasoline.
Don't miss your chance to bid on this BMW M3 COMPETITION 2022 WBS33AY05NFM43885. Best of luck with your auction!